← Chapters

7. Infrastructure

118 questions
1. What is Telangana's contracted power capacity in 2025-26? ↓
2. By what percentage did contracted power capacity grow between 2024-25 and 2025-26? ↓
3. What will Telangana's total contracted power capacity reach including projects under construction? ↓
4. What share of Telangana's contracted power capacity is fossil fuel-based? ↓
5. What is the sector-wise break-up of Telangana's commissioned contracted power capacity? ↓
6. What is TGGENCO's installed power capacity as on 25 January 2026? ↓
7. What caused the increase in TGGENCO's installed capacity between 2023-24 and 2025-26? ↓
8. When are the remaining two units of the Yadadri supercritical thermal power station expected to be commissioned? ↓
9. Which existing thermal station is proposed to be replaced by a new 1×800 MW ultra-supercritical plant at Ramagundam? ↓
10. What is TGGENCO's target capacity under its Solar Capacity Addition Programme? ↓
11. What is the total budget investment for installing pollution control equipment (FGD units, ESPs) at KTPS Stage VII, BTPS, and YTPS? ↓
12. How many Extra High Tension (EHT) substations does Telangana have in its transmission network? ↓
13. How many 33/11kV substations exist in Telangana's distribution network? ↓
14. What was the total cost of the 6 schemes proposed by TGTRANSCO and DISCOMs under the Power System Development Fund (PSDF) during 2024-25? ↓
15. What was Telangana's peak load demand, maximum daily energy met, and total energy supplied over recent years? ↓
16. What is Telangana's per-capita electricity consumption? ↓
17. How did TGTRANSCO's net worth and outstanding loans change recently? ↓
18. How many total electricity connections does Telangana have? ↓
19. What is Telangana's total contracted renewable energy capacity (including hydro)? ↓
20. Under the Telangana Clean & Green Energy Policy-2025, what renewable capacity targets has the State set for 2030 and 2035? ↓